Capital Projects & Equipment Purchases
Administrative Building
Rehabbed space and converted to
office space
Demolished and constructed new
front steps and railings
Added new generator circuits
throughout to power all offices
Created new server room with
dedicated AC
Replaced 1,200 slate roof tiles &
installed snow rails over all exterior entrances
Installed boiler controls to
reduce oil consumption
Blacksmith Shop & Old Maintenance/Farm
Building
Complex
Excavated and constructed sidewalk
between nursing home & courthouse
Created master garden area in
vacant lot, gazebo & footbridge between nursing home and
courthouse
Drainage & Erosion Project
(installed new catch basins, storm drains, infiltration ponds,
sheet-pile and concrete segmental walls, reconstructed embankments
and restored access road to Howard Island)
Installed complex sewage meter
Constructed water storage tank and
distribution system
Rerouted and reconstructed water
tank access road
Eliminated generator, transferred
load to adjacent generator and created new switch gear room with new
automatic transfer switch to eliminate safety deficiency identified
by NH Dept of Safety
Installed new flagpoles at nursing
home, Community Corrections and cemetery
Completed complex-wide energy
audit
Conducted hydrogeological
test/study of county property to determine feasibility of drilling
wells for county owned municipal water system for complex
Courthouse
Replaced carpet in main lobby,
back hallway, main stairway, Corrections & Probation office,
County Attorney office, Dispatch and Sheriff’s Dept offices
Replaced DDC system that controls
& monitors building HVAC equipment
Revamped old Registry of Deeds
vault & office space, relocated generator switch gear &
created new dispatch center and radio room with dedicated AC systems
Gutted old Corrections &
Probation offices and created an enlarged County Attorney office
with glass partition & service counter
Refurbished old UNH Extension
office for Corrections & Probation
Removed old ballasted roof and
replaced with EDPM rubber membrane roof
Connected boilers, pumps and other
essential equipment to emergency generator
Replaced outside transformer
feeding building
Upgraded majority of lighting from
T12 to high efficient T8 lighting
Replaced carport furnace
Fabricated & installed safety
panels in stairway and balcony railings, extending height and closed
in large openings to eliminate fall hazard
Department of Corrections
Renovated medium unit &
installed new stainless steel toilet/sink combos
Constructed sleeping and shower
area in 1930 Building to house minimum security inmate farm help
Constructed sleeping and shower
area in old recreation room in basement for segregation unit inmates
Constructed sleeping and shower
area in main basement area for minimum security inmates
Gutted and re-plumbed pipe chase
between segregation & lock block
Constructed laundry facilities in
women’s and minimum security housing areas
Renovated kitchen so jail could
serve meals in-house
Upgraded T12 lighting in 1988
addition to energy efficient T8 lighting
Farm
Gutted old wiring in barns and
completely rewired the cow and pig barns
Installed fire alarm systems in
the cow and pig barns
Stripped old asbestos roofs off
barns and corn crib and replaced them with standing seam roofs
Constructed new silage bunker,
paved bunker aprons, installed catch basins and infiltration pond to
correct drainage problem
Installed new electrical service
to heifer barn
Gutted old water line system in
main barn and installed new one
Demolished old cupolas on cow barn
and constructed new ones
Closed in and finished off
lean-too on south end of cow barn
Constructed new lean-too on south
side of pig barn
Designed & GC’ed
construction of new maintenance/farm building
Nursing Home
Installed in-ground grease trap
Installed dedicated AC system in
server/telephone room
Installed AC systems that provide
cooling to laundry, kitchen and dining room areas
Cleaned HVAC ducting throughout
Added sprinkler coverage to
outside overhangs
Installed numerous fire dampers,
fusible links, access panels and hatches to correct numerous
deficiencies
Installed new maglock keypads
throughout
Installed lighting controls
throughout
Installed ozone injection system
in laundry to reduce energy consumption
Installed boiler controls to
reduce oil consumption
Vehicles & Equipment
¾ ton pickup with 8’ plow
Man-lift lift with 60’
articulating boom
JD4115 tractor with bucket,
blower, broom and York rake
Industrial inventory cabinets &
shelving for maintenance shop
Replaced wood shop equipment lost
in fire
Scaffolding
Current / Pending Capital Projects &
Equipment Purchases
Administration Building
Community Corrections
Complex
Courthouse
HVAC duct cleaning (funded)
Carpet Superior Court office,
lawyers lounge, Family/District Court office, DMV, upper conference
room and interview rooms by DMV
Replace lobby seating
Department of Corrections
Farm
Nursing Home
Vehicles & Equipment
|
|